我需要解决方案
We recently upgraded from 7.5.05 to 7.6.02.
SLPs were running fine in 7.5.05
In 7.6.02, we notice that at any given time, there are more than 3 SLP jobs waiting on the same tape. We also noticed that at times, the tapes jump back and forth between SLPs.
I do know about the new features in 7.6 and how one can set them in the Master Server config- SLP Parameters. I also read a whitepaper here.
My question is: Is there a calculation or any other way to arrive at a value for the SLP Properties in the SLP parameters GUI.
EDIT: I just same 7 jobs waiting for the same tape.
Thanks,