Hi all,
We made some changes in the Vault process and now we have 01 Daily and 01 Weekly Vault. At a certain time of the day, the two processes occur simultaneously. Therefore, we allocated 02 backup drives for each process. (Tape Library has 04 drives)
Allocating the 04 drives in both cases (daily and Weekly), these Jobs will conflict (hold), or will only switch the use of these drives? (4 to 2 and 2 to 4)
The intention is to use 100% of the resources, speeding up the entire process.
Could Help?