Dear All,
I have some full VM (hyper-V) backups which end on error 196 every week on the same day (Monday night). The easiest solution is to change the backup window but I have plenty of backup window over on other days.
When the clients misses there backup window the full backup is automatically taken the next day (Tuesday night).
I assumed that in the following week the full backup of these client would be taken on Tuesday night but instead it tries to take the full backup again on Monday night and fails again with error 196.
I toke a manual full backup during the day on Friday with the hope the full backup scheduled would shift to Friday night but this week the backup policy tried again to take the full backup on Monday night.
I read David Chapa's article. I understood that manual backup have influence on scheduled backups.
I did take a manual backup to influence the scheduled backup but it didn't work. Does this article still apply? I'm running Netbackup 7.6.0.4 on Windows Server 2008 R2.
How can I force the full backup of some clients taken on another day?
Regards,
Erwin